News

Sitec awarded NICEIC Accredited Supplier

Sitec awarded NICEIC Accredited Supplier

As part of our ambition to manage and own all aspects of delivery within the deployment lifecycle, Sitec are delighted to have become a NICEIC Accredited Supplier. Quality is paramount and our accreditation from NICEIC recognises our achievements in meeting the high standards required, whilst ensuring that these standards are constantly maintained.

UK Telecoms Golf Open – Tony Bradshaw Cup

After a fiercely competitive two leg tournament, with the second instalment concluding on Friday at the beautiful Arden Course, Forest of Arden, it was terrific to see father and son pairing Alan and Grant Penman from WFS Telecom take the honours for this inaugural event and claim the Tony Bradshaw Cup. Well done and thanks to all those who attended over both legs and we look forward to seeing you to do it all again in 2018.

Podium Place for Our Dragon Boat Team

Podium Place for Our Dragon Boat Team

 

 

Despite the rather disparate and inexperienced nature of our team, what a fantastic achievement to see Sitec’s Dragon Boaters battle through the other 47 competitors and finish in a lofty third place. Well done guys!

Virgin Media Project Lightning – Hanover Gardens Great Yarmouth

Virgin Media Project Lightning – Hanover Gardens, Great Yarmouth

A recently completed MDU (Multi Dwelling Unit) comprising of 31 flats, supplying Virgin Media RF and Telco services from a wall mounted L5 lockbox. 125m of civils comprising verge, footway and carriageway were completed leading to both internal and external cabling solutions. Commissioning was completed in-house.

Sitec continuing a pace with similar multiple schemes.

Huawei Design Programme

Huawei Design Programme

As one of the Uks largest design houses, supporting the UK mobile telecoms market, Sitec has been responsible for delivering over 1000 multi-skilled visits and associated drawing packs for Huawei EE, since the start 2015.

TYPE OF ACTIVITY Design Visits and Drawing Production
DATE
From 2015
SPECIFICATION DETAILS Huawei EE1800 Upgrades
 HEIGHT DETAILS Various
Huawei Design Programme Masts

Acquisition Case Study

Acquisition Case Study

 

TYPE OF SERVICE Surveying
DATE On going
PROJECT DETAILS Case studies to follow

 

Sitec employs proactive acquisition surveyors to help them deliver to client expectations. This ethos is demonstrated through their delivery of Corporate In-building schemes, through to rural village coverage projects, micro and small cells and their ability to deliver on macro upgrade programmes. Sitec complement these skills with unrivalled planning support, which focuses on determining the right solution for the proposed installation. Project examples will be uploaded shortly to tell this story with real examples….

Acquisitions case study with a telecoms tower looking up

Lanarkshire – Vodafone Huawei

Lanarkshire – Vodafone Huawei

This particular upgrade of a rural greenfield site involved working in conjunction and managing many suppliers and agencies. Its successful completion has now enabled 4G connectivity.

TYPE OF INSTALLATION Greenfield Site
DATE INSTALLED
June 2015
SPECIFICATION DETAILS Replacement CU Phosco Monopole
 HEIGHT DETAILS 15 metres
Lanarkshire Vodafone Huawei yellow roadside crane
Lanarkshire Vodafone Huawei foundation of telecoms mast

West Wickham – Arqiva Vodafone

West Wickham – Arqiva Vodafone

Rooftop upgrade located in Greater London. Scope of works to complete upgrade alongside other licenced operators, utilising a specialist crane in a restricted area with only millimetres spare on either side of the shared access. Its successful completion has now enabled 4G connectivity.

TYPE OF INSTALLATION Rooftop Site
DATE INSTALLED January 2016
SPECIFICATION DETAILS Replacement antennas and increased cabinet and grillage area
 HEIGHT DETAILS 19 metres

 

TYPE OF INSTALLATION Quiet Revolution QR5
DATE INSTALLED
August 2011
SPECIFICATION DETAILS 5kw
 HEIGHT DETAILS 18 metres
West Wikham

Huawei EE L800 Upgrade – Kent Institute of Art & Design

Kent Institute of Art & Design – MBNL Huawei

This particular upgrade of the Kent Institute of Art & Design Rooftop site involved working closely with the Institute. The principal scope was for a full antenna swap with new feeders + a new Eltek PSU install. Its successful completion has now enabled L800 connectivity within December deadlines.

TYPE OF INSTALLATION Rooftop Site
DATE INSTALLED December 2016
SPECIFICATION DETAILS L800 Upgrade which included Eltek PSU install via Crane solution
 RADIUS DETAILS 44 metres